CONTACT US

Our Address

Science Avenue, High-tech Zone, Zhengzhou City, Henan Province, China

  • How much quantity of steel required for 1m3 concrete? - Quora

    Quantity of steel is not dependent on the volume of concrete, but on the structure where it is being used. Slabs: 0.7 to 1.0%, Beams: 1% to 2%, Columns: 1% to 5% It may vary depending upon the loading condition as well For Example Lets take exampl...

  • How much steel is required for 1 cubic meter of RCC? - Quora

    You May assume 80 kg of steel for one cubic meter ofRCC slab

  • Quantity of Steel per m³ – we civil engineers

    Jan 26, 2018  Tags: concrete reinforcement ratio table, estimation and cost analysis, Estimation and Costing, How do I calculate quantity of steel in R.C.C slab/column/beam, how many kg of steel in 1 cubic meter, how much steel required for 1 cubic meter concrete, how to calculate quantity of steel and cement from drawing, how to calculate steel in rcc slab ...

  • how must steel will use for 1 cubic meter.formula of steel ...

    R.c.c Road = 0.6 % % steel Required in volume of concrete (1) Here take Column 1 m3 concrete volume calculation is (2.5 x 1/100) x 7850 =196.25 kg steel Required

  • how much steel required for 1 sq.m area?

    how can be possible that 1 sq mtr slab area required 25 to 30 kg steel in simple term residential building in slab having a thickness 110 to 125 mm provided Reinforcement generally #[email protected] c/c for distributer bar #[email protected] c/c spacing then calculation says that 5.530+1.825 => 7.355 Kg Per Sq mtr in slab

  • For one meter cube of concrete how much kg steel is required?

    Eg:- Load (tensile force) on beam is slightly greater than load on slab so, steel quantity in beam is slightly more than slab. Likewise in every structural elements. Therefore, Slab /lintel——0.7 to 1.0% (55 to 78.5kg)/m^3. Columns_____0.8 to 6.0% (62.80 to 471kg)/m^3. Beam _____1.0 to 2.0% (78.5 to 157kg)/m^3

  • How many kg of steel reinforcement in one cubic meter ...

    It all depends on the type and sizes of the steel used. It also depends on the load that the concrete has to take at certain points. 7865kg is the weight of a cubic meter of steel. Typical ...

  • how much steel required for 1 square meter slab?

    Answer / s.nagabhushana rao. Normally steel required for the slab is designed based on the type of slab the load factors.Normally for thumb rule at site we take as 15 kg / sq mtr.

  • Concrete mix design - planete-tp : All about public works

    * then the amount of water (generally between 130 and 150 Litres for 1m3 of concrete) * and lastly, if required, the amount of additives (a few Kilograms for 1m3 of concrete). One cubic metre of concrete weighs 2.5 Tonnes. Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.

  • Concrete Calculator - Estimate Cement, Sand, Gravel ...

    Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

  • how much steel required for 1 sq.m area?

    how can be possible that 1 sq mtr slab area required 25 to 30 kg steel in simple term residential building in slab having a thickness 110 to 125 mm provided Reinforcement generally #[email protected] c/c for distributer bar #[email protected] c/c spacing then calculation says that 5.530+1.825 => 7.355 Kg Per Sq mtr in slab

  • How many kg of 16mm rebar per m3 of concrete? - Bayt ...

    4) % of steel volume in Slab concrete = 0.7 to 1.25 % in single mesh. 5) % of steel volume in Slab concrete = 1.4 to 2.5% in double mesh. Lets consider you have column and 3% of steel in column concrete. Desnity of steel rebar= 7850 Kg/m3. Volume of concrete of column = 1m3. Volume of steel rebar in concrete = 3%=3/100*1 =.03 m3. Weight of ...

  • Concrete mix design - planete-tp : All about public works

    * then the amount of water (generally between 130 and 150 Litres for 1m3 of concrete) * and lastly, if required, the amount of additives (a few Kilograms for 1m3 of concrete). One cubic metre of concrete weighs 2.5 Tonnes. Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.

  • how much steel required for 1 square meter slab?

    Answer / s.nagabhushana rao. Normally steel required for the slab is designed based on the type of slab the load factors.Normally for thumb rule at site we take as 15 kg / sq mtr.

  • How to Calculate Steel Quantity Per Cubic Meter Quantity ...

    In the special civil engineering article, it will be guided in what way to compute Steel quantity for each M³ for Lintel, Slab, Beam, Foundation and Column. Least/Minimum steel percentage is equal to 0.7 percent. Steel Quantity is equal to [0.7/100] x 1 is equal to 0.007 m 3 Steel Weight is equal to 0.007 x 7850 is equal to 54.95 ≊ 55 kg/m 3

  • How much is the common Weight of Reinforcement in Kg/m³ ...

    Dear Habeeb, It is depend how much MPA for the concrete, higher concrete MPA need high rebar also. As my experience for Fc32 is200 -250 kg/m3. For Fc40 is200 -400 kg/m3, but these are not efficience. Normally the ideal is110-125 kg/m3. I hope this information useful for you. Thanks Andi

  • Quantity Of Cement, Sand, Aggregates For 1000 sq ft Slab

    Jun 27, 2018  So by multiplying the quantity of cement with the density of cement, we will the get quantity of cement in terms of kilograms. Unit weight or Density of cement = 1440 kg/cu.m. Quantity of cement in kg(s) = 1440 x 3.90 = 5616 kg. We know that 1 cement bag = 50 kgs

  • Concrete Calculator - Estimate Cement, Sand, Gravel ...

    Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

  • How to Calculate Cement, Sand and Aggregate required for 1 ...

    Total weight of concrete ingredients = 50+115+209+27.5 = 401.5 say 400 kg. Density of concrete = 2400 kg/cum. So, 1 bag of cement produces = 400/2400 = 0.167 cum. No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags. From above, if the concrete mix is 1:2:4 , to get a cubic meter of concrete we require. 1.Cement = 6 bags ...

  • Quantities of Materials Per Cubic Meter of Concrete Mix ...

    16 x 20 = 320 kg cement for 1 cub meter of concrete by 640 kg of sand, and 1200 kg aggregate Now for every 5 mpa increase in strength we drop the F factor by one So for 25 mpa the formula becomes: F-15: so 15 x 25 = 375 kg cement/ cub.meter For 30 mpa we use F-14. 14 x 30 = 420 kg cement/cub.meter Etc. All by WC ratio of 0.5-0.6

  • how much steel required in cubic meter of concrete - ...

    Feb 05, 2013  how much steel required in kg for 1 cubic meter m20 concrete . Posted at: August 16, 2012. How much steel required in one cubic meter How much steel required in one cubic meter concrete = 100kg »More detailed

  • 4.7/5(1.8K)
  • Reinforcement Estimates - YourSpreadsheets

    Typical average weight of reinforcement (kg/m3) in concrete building elements. The below figures are for guideline only and may vary for different projects. Concrete building element. Weight of reinforcement in kg/m3. ... Commercial = 100 kg/m3 Institutional = 90 kg/m3. Your comments:

  • For one meter cube of concrete how much kg steel is required?

    For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b ...

  • Concrete Mix Design – M 20 Grade Of Concrete

    Ca = 1223.8 Kg/cum. The final mix proportions of M-20 grade of concrete become:-Advertisements. ... I want to know how much quantity of steel required for column,slab,footing per cu m.send me the answer approximately. Reply Link. ... aggregate for m-25 concrete for 1

  • Concrete Calculator - Estimate Cement, Sand, Gravel ...

    Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

  • How much steel is required for one cubic meter of concrete ...

    Steel bars quantity will be according to structure element; but a (very) rough average of 120 KG per cubic meter. 1. 0. ... How much steel required in one cubic meter concrete = 100kg or 0.1ton

  • Steel quantity by thumb rule - geekinterview

    so first 10cum converted into CFT that is 353.10(10/0.02832)=353.10 Cft x 7 lbs/Cft =2471.70 then convert in to Kg so =1121.16 Kg is the answer.so in 10cum qty of concrete required 1121 kg steel. Was this answer useful?

  • Why don't We Exclude Steel Volume in Concrete Calculation ...

    We will calculate the required concrete volume for the above beam as, V = L x B x D = 3 x 0.2 x 0.5 = 0.3 m 3. According to the thumb rule, the concrete wastage is 3%, the reinforcement for the above example may be 3% = 0.009 m 3

  • Concrete Mix Design – M 20 Grade Of Concrete

    Ca = 1223.8 Kg/cum. The final mix proportions of M-20 grade of concrete become:-Advertisements. ... I want to know how much quantity of steel required for column,slab,footing per cu m.send me the answer approximately. Reply Link. ... aggregate for m-25 concrete for 1

  • How to Calculate Steel Quantity Per Cubic Meter Quantity ...

    In the special civil engineering article, it will be guided in what way to compute Steel quantity for each M³ for Lintel, Slab, Beam, Foundation and Column. Least/Minimum steel percentage is equal to 0.7 percent. Steel Quantity is equal to [0.7/100] x 1 is equal to 0.007 m 3 Steel Weight is equal to 0.007 x 7850 is equal to 54.95 ≊ 55 kg/m 3

  • Thumb rule for steel qty for 1m2 in kg/m2 column slab ...

    which size of box use of cement,sand,aggregate to use the m 20 concrete. i know the quantity of material cement 400 kg or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only 1 beg cement so pls give me answer . thx in advance . 4 Answers HCC,

  • For one meter cube of concrete how much kg steel is required?

    For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b ...

  • Reinforcement Estimates - YourSpreadsheets

    Typical average weight of reinforcement (kg/m3) in concrete building elements. The below figures are for guideline only and may vary for different projects. Concrete building element. Weight of reinforcement in kg/m3. ... Commercial = 100 kg/m3 Institutional = 90 kg/m3. Your comments:

  • How much steel required in 1 square feet slab?

    .75 kg to 1.1 kg steel required for 1sqft slab. Is This Answer Correct ? 135 Yes : 21 No : How much steel required in 1 square feet slab?.. Answer / ... FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38 .

  • Calculation of Concrete - zhitov

    help on calculating materials for concrete Specify the required proportions. E - The required amount of concrete. Stated in cubic meters. M - How many bags of cement required for 1 cubic meter of concrete. K - Weight of one bag of cement. In kilograms. Enter the cost of the materials in your area.

  • Concrete @ your Fingertips - The Concrete Society

    Mix: Materials: 0.2 m 3 concrete: 0.5 m 3 concrete: 1 m 3 concrete: A1: cement (no. 25 kg bags) 2.5: 6: 12: sand (volume in m 3): 0.1: 0.25: 0.5: coarse aggregate ...

  • How much steel is required in kg for 1 cubic meter concrete?

    steel is required in kg for1 cubic meter concrete is betweenkg and kg

  • Quantity and Rate Analysis for Reinforced Concrete ...

    Lets take example of RCC Column, where reinforcement required is 2.5% of concrete volume, weight of steel required will be: =196.25 kg. 2. Labour Requirement for 1m 3 of RCC: Labours required are presented in terms of days required by particular labour to complete its work for the given quantity of concrete. Following are the various labours ...

  • Steel quantity by thumb rule - geekinterview

    so first 10cum converted into CFT that is 353.10(10/0.02832)=353.10 Cft x 7 lbs/Cft =2471.70 then convert in to Kg so =1121.16 Kg is the answer.so in 10cum qty of concrete required 1121 kg steel. Was this answer useful?

  • Thumb rule for steel qty for 1m2 in kg/m2 column slab ...

    which size of box use of cement,sand,aggregate to use the m 20 concrete. i know the quantity of material cement 400 kg or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only 1 beg cement so pls give me answer . thx in advance . 4 Answers HCC,

  • How much does 1 cubic meter of average steel weight in ...

    Steel weight, 7850 Kg/cu.m. Upvote (0) Downvote (0) Reply (0) ... How much steel is required in kg for 1 cubic meter concrete? What is the quantity of water in one cubic meter of concrete? How to determine the volume of water per cubic meters of concrete? Find Jobs. Jobs in Abu Dhabi;

  • Concrete Mix Design – M 20 Grade Of Concrete

    Ca = 1223.8 Kg/cum. The final mix proportions of M-20 grade of concrete become:-Advertisements. ... I want to know how much quantity of steel required for column,slab,footing per cu m.send me the answer approximately. Reply Link. ... aggregate for m-25 concrete for 1

  • How many kg of Ready-Mixed Concrete do i need for 1m³?

    Then finding out how many packs or bags of dry concrete/dry concrete mix you have to buy for the calculated volume is a bit trickier. So if you want to mix concrete to fill a certain cubic meter and want to know how many bags of 25 kg concrete, 35 kg concrete or 40 kg concrete each can be bought, then you’ve come to the right place.

  • How much steel required in 1 square feet slab?

    .75 kg to 1.1 kg steel required for 1sqft slab. Is This Answer Correct ? 135 Yes : 21 No : How much steel required in 1 square feet slab?.. Answer / ... FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38 .

  • How Much Weight Is 1m3 Of Steel - Answers

    Concrete has a density of approximately 2400 kg/m3. As such the weight of 1m3 of concrete is equal to: 2400 x 9.81 Weight of 1m3 of concrete = 23,544 Newtons.

  • Concrete @ your Fingertips - The Concrete Society

    Mix: Materials: 0.2 m 3 concrete: 0.5 m 3 concrete: 1 m 3 concrete: A1: cement (no. 25 kg bags) 2.5: 6: 12: sand (volume in m 3): 0.1: 0.25: 0.5: coarse aggregate ...

  • Calculation of Concrete - zhitov

    help on calculating materials for concrete Specify the required proportions. E - The required amount of concrete. Stated in cubic meters. M - How many bags of cement required for 1 cubic meter of concrete. K - Weight of one bag of cement. In kilograms. Enter the cost of the materials in your area.

  • Quantity and Rate Analysis for Reinforced Concrete ...

    Lets take example of RCC Column, where reinforcement required is 2.5% of concrete volume, weight of steel required will be: =196.25 kg. 2. Labour Requirement for 1m 3 of RCC: Labours required are presented in terms of days required by particular labour to complete its work for the given quantity of concrete. Following are the various labours ...

  • Thumb rule of formwork quantity for High rise buildings.

    Uday Bhaskar: 1Cum of earth works 3-4 time of concrete on earth work Steel to be considered 100-120 KG Shuttering area 4-6 Times of the volume Individual houses -2-4 kg steel to be considered per Sft, high towers upto 5Kg/Sft Posted: 1107 days ago

  • How to Calculate the Steel Quantity in Column Footing ...

    Oct 15, 2017  Suppose we have a Column Footing having a Length 2 m, Width 2 m and having a Thickness 0.250 m. The main bars is 12 mm @ 150 c/c and Distribution bar is also 12 mm @ 150 c/c. The footing clear cover is 50 mm from the top and 75 mm from the bottom.

  • Reinforcing requirements based on % of concrete volume ...

    Where V = Total volume of reinforced concrete element Vs = Total volume of steel in the element volume w = unit weight of total volume (= 165 lb/ft3 according to frostryan's formula) wc = unit weight of concrete (= 150 lb/ft3 - a typical value) ws = unit weight of steel (=

  • Calculations for Steel Rebars Weights - MEC Engineers

    How to Calculate Weights of Steel Bar Reinforcement in Reinforced Concrete Works. Reinforcement for Concrete Works may consist of Round Bars, Deformed bars, and Welded Mesh fabric and are used in concrete slabs, walls, beams, columns. For estimation of quantities of rebars for the purpose of costing is based on total weights in Kg or Tons.